Skip to main content

Asbestos London Survey

Asbestos Removal

Asbestos Removal

Fully managed asbestos removal co-ordinated by Asbestos London, safely delivered by HSE-licensed contractors

Surveys completed
0 +
Property service focus
0
Survey reports
0 hr
Overview

About this service

Damaged asbestos-containing materials or materials that may be disturbed by planned work require assessment by a competent professional. Depending on the material and risks, suitable measures may include repair, sealing, enclosure or removal. Contact us to discuss the assessment and support needed for your property. Any removal work must be carried out by appropriately trained contractors, with an HSE licence where the work requires one. Required clearance and waste documentation depend on the work undertaken.

Scope and price confirmed before booking.

What's included

Everything you get

End-to-end project management: Asbestos London Survey co-ordinates every stage on your behalf

Selection and appointment of HSE-licensed removal contractors from our vetted network

HSE advance notification submitted at least 14 days before licensed works commence

Pre-works refurbishment and demolition survey arranged where not already in place

Full enclosure and negative-pressure containment overseen by the appointed site team

Continuous personal and static air monitoring throughout all works

Four-stage clearance procedure: visual, thorough visual, air sampling, certificate of reoccupation

Clearance air testing can be arranged through an independent laboratory when required

Licensed hazardous waste disposal with consignment notes provided

Cradle-to-grave waste tracking: complete documentation chain to disposal facility

Certificate of reoccupation issued on successful clearance

Post-works asbestos register updated to reflect all materials removed

Why choose us

Asbestos London Survey

Experienced surveyors

Experienced asbestos survey support for a range of property types.

Clear practical reporting

Reports written for non-specialists with prioritised actions, not impenetrable jargon.

Reliable scheduling

Confirmed appointments with surveyors who aim to arrive on time and keep you informed of any changes.

Laboratory analysis for asbestos identification

Samples are analysed to identify asbestos fibre types and support clear survey findings.

Save 15 to 20%

Need a fire risk assessment too? Get both in one visit

We carry out combined asbestos surveys and fire risk assessments on all property types, one visit, two comprehensive reports, typically 15 to 20% cheaper than booking separately.

How it works

What happens next

01

Get in touch

Call 07707 999369 or fill in our online form. We will confirm availability and the next steps.

Response timescale confirmed from your enquiry

02

Book your survey

Choose a date that suits you, typically within 3 to 5 working days. Urgent bookings available.

Professional asbestos survey experience

03

Survey carried out

A surveyor visits your property, inspects relevant areas and suspect materials, and takes samples where required. Surveyor qualifications can be confirmed when you book.

Surveyor qualifications available on request

04

Report delivered

Clear reporting with findings, risk information and practical recommendations based on the work carried out.

Digitally delivered, legally compliant

How it works

Common questions

No. Asbestos-containing materials that are in good condition, properly encapsulated, and not at risk of being disturbed can often be safely managed in place under a documented management plan. Removal is required when materials are damaged or deteriorating, when refurbishment or demolition work will disturb them, when the material poses an ongoing risk that cannot be adequately controlled, or at the end of a building's life before demolition. Our surveyors will advise on the most appropriate course of action following a survey.

The four-stage clearance procedure is the mandatory sign-off process that must be completed before an enclosure is dismantled and the area is returned to use. Stage 1: a thorough visual inspection of the enclosure by the removal contractor to confirm no visible debris or contamination remains. Stage 2: a second thorough visual inspection by an independent licensed asbestos analyst. Stage 3: aggressive air sampling within the enclosure to confirm airborne fibre levels are below the clearance level of 0.01 fibres per millilitre. Stage 4: issue of a certificate of reoccupation by the analyst. All four stages must be passed before the area can be reoccupied.

Notifiable asbestos removal work (NNLW) and licensed asbestos removal work (LARW) are the two categories of controlled asbestos work under CAR 2012. Licensed work involves the highest-risk materials, including asbestos insulation board (AIB), pipe lagging, sprayed coatings, and any work that could release significant quantities of fibres. It must be carried out by HSE-licensed contractors with 14 days advance notice to the HSE. Non-licensed notifiable work involves lower-risk materials such as asbestos cement, vinyl floor tiles, and textured coatings. It does not require an HSE licence but must be notified to the appropriate authority before work starts. We advise on the correct classification for your specific materials as part of every project.

Duration varies significantly depending on the type, quantity, and location of the asbestos. A small domestic removal, such as a single garage roof or a single room of artex, typically takes one to two days. Medium-scale commercial removals involving insulation board in a single floor of offices may take three to five days. Large or complex projects involving extensive pipe lagging, sprayed coatings, or multi-phase programmes in occupied buildings can run to several weeks. We provide a detailed, phased programme with every quotation.

Yes. If asbestos has been accidentally disturbed during works, damaged by fire, flood, or impact, or discovered unexpectedly in a way that poses an immediate risk, contact an appropriate asbestos professional for advice. Our emergency service includes immediate area isolation, fibre count testing, risk assessment, and emergency removal if required. Call 07707 999369 to discuss the situation and arrange appropriate next steps.
Yes. A refurbishment and demolition (R&D) survey must be completed for the area where removal works will take place before any licensed removal can commence. This is a legal requirement under CAR 2012 and the HSE's ACOP L143. If you do not already have a current R&D survey, we can arrange this quickly and use the findings to prepare the removal specification and programme. If an emergency means works cannot wait, our surveyors can attend alongside the removal team.
Yes. A certificate of reoccupation (also known as a clearance certificate) is issued by the independent licensed asbestos analyst on successful completion of the four-stage clearance procedure. This document confirms that the area has been cleared to below the statutory clearance threshold and is safe to reoccupy. The certificate forms part of your compliance documentation and should be kept alongside your updated asbestos register and waste consignment notes.

Get your fixed-price quote, response timescale confirmed from your enquiry.


Prefer to talk it through?

Speak directly to our team about your property.

Mon to Fri, 8am to 6pm · Emergency line 24/7

Book your asbestos management survey today

Talk to an expert and get a fixed-price quote. Response timescale confirmed from your enquiry. No obligation. Scope and costs confirmed before booking.

Asbestos survey support across London · Clear reporting · Practical guidance

Request a Quote